Reporting from scheduler?
Posted: Wed Mar 09, 2016 3:27 pm
I've got over 300 jobs scheduled in the GAD scheduler. Sometimes I have to rerun specific jobs manually due to downtime, maintenance, etc. From the scheduler, I can do a "search all" and export to a spreadsheet, but it doesn't have all the info I need.
I'm trying to create a report somehow that lists all the jobs I have scheduled, with the trigger type (daily/weekly/etc) and the detail such as, job is scheduled for Daily at 3:00 am, Repeats always for 3 hours, 20 minute interval.
I use the scheduler search to narrow the jobs by next run time, but it's difficult, because I still have search every trigger type.
Has anyone found a way to do this?
I'm trying to create a report somehow that lists all the jobs I have scheduled, with the trigger type (daily/weekly/etc) and the detail such as, job is scheduled for Daily at 3:00 am, Repeats always for 3 hours, 20 minute interval.
I use the scheduler search to narrow the jobs by next run time, but it's difficult, because I still have search every trigger type.
Has anyone found a way to do this?